Civil/structural design for residential, commercial, industrial and institutional buildings; Structural Integrity Assessment for buildings, tanks, retaining walls, towers and pipelines; Earthworks design; borrow pits, cut/fill balance calculations, slope protection and erosion control measures.
CLIENT: Department of Agriculture and Agrifood
The Betumpu Integrated Technology Farming Area (BITFA) Masterplan was commissioned by the Department of Agriculture and Agrifood in June 2014. The client wanted to develop a coherent strategy for uplifting the Betumpu Agricultural Development Area with the objectives of showcasing high-tech vegetable farming and integrated farming, as well as engaging the Brunei public and international visitors in their agricultural development program and presenting working models for future private sector investment.
BITFA will be a agri-tech park where visitors can have first-hand experience of Brunei’s hi-tech farming practices, and sample the lifestyle, produce, and environment of a working farm. Showcase farms will demonstrate advanced agricultural practices. The park is conceived with three major themes: Agri-Economy, Agri-Education, and Agri-Tech.
Infrastructure upgrades are necessary to ensure all allotments are equally serviced and available for uplift to hi-tech farms. Infrastructure improvements will include an upgraded and expanded road network, drainage system upgrades and bio-retention basins, power supply and distribution network improvements, irrigation system enhancement, potable water and sewerage connections, and telecommunications upgrades.
A Central Facilities Site forms the public gateway to BITFA and provides a prominent frontage. The Main Facilities comprises a cluster of feature buildings with an integrated iconic design theme: parabolic domes in the form of an 'igloo' or 'beanpod’ shape. The design represents agricultural innovation, and provides an iconic design thread throughout the site that visitors will associate with the BITFA Facilities.
CLIENT: GOLDEN CORPORATION
Objective:
1. To provide intensive prawn farming facilities capable of production yields upwards from 15 tones per hectare per annum.
2. To provide facilities suitable for prawn species favoured by the Department of Fisheries.
3. To plan wastewater treatment facilities capable of discharging into receiving waters in compliance with Brunei’s Pollution Control Guidelines.
Layout:
Penyatang Aquaculture Masterplan comprises 498 hectares of land based facilities dedicated to intensive shrimp culturing, and a research centre for commercial development of fisheries resources in Brunei.
The intensive shrimp culturing is undertaken in five farm zones, each approximately 80 hectares in size. Production ponds are 7500m2 on a grid layout using open PE lined ponds with partial recirculating water supply. Each of the farm zones has space set aside for water balance/inlet treatment ponds, staff accommodation and offices, feed and equipment storage buildings and a wastewater treatment system.
CLIENT: GOLDEN CORPORATION
CONSTRUCTION COST ESTIMATE: B$ 22.23 MILLION
Another 233 hectares have been leased to Golden Corpn for production of Black Tiger Prawn (Penaeus monodon). KPI prepared a Masterplan that creates interconnecting tidal canals to bring oxygenated water into the farm for pumping into short term conditioning reservoirs, then distribution flumes supplying 129 ponds each averaging 7,500m2 surface area.
Wastewater will be processed through aerated treatment basins with three days residency to achieve Brunei Pollution Control effluent standards, Daily water consumption for Zones C to E is 328ML for 30% water replacement. Using 500L/sec pumps in sequence, each pump
lifting 21,600m3 per 12 hour shift. New 11kv substations are required for pumps, aerators,
and lighting for the pond areas. Each farm module has a service building containing pumps, water treatment, and aeration system. A centralised managers office and staff quarters are located near the entry gate with a Visitor Centre proposed overlookingthe 450 hectare facility. When complete the facility will produce 4,000 tonnes of shrimp annually for local consumption and export.
CLIENT: BEDB/ GOLDEN CORPORATION
CONSTRUCTION COST ESTIMATE: B$ 84.5 MILLION
Masterplan and Detailed Design for Panaeus Rostris Prawn Production Farm over a 373 hectare green-field site. Production ponds of 7,500m2 totaling 187 ha surface area, with four conditioning reservoirs over two phases of development.
Seawater delivery is from a coastal intake and 2.5 km low head pumping into the conditioning reservoirs. Supply into production ponds is via pipeline with 20% replacement volume per day, requiring 378ML over a 12 hour period.
Annual production of the facility is projected at 4,788 tonnes per annum, of 60-65 gms fresh shrimp for export.
Earthworks amounting to 850,000m3, 3 km of roads, 2 bridges, 2x 11kv substations, pump station, drainage system, and wastewater treatment to be installed over a 48 month construction period.
CLIENT: PWD – Drainage and Sewerage
Completed: March 2012.
Principle objectives of the project are to: identify major sources of sediment transport and deposition through five major rivers; determine implications for landuse and flooding; identify Best Practice Measures; define capital works for rehabilitation.
The estimated annual cost of sedimentation to the Brunei economy is B$4.88 million from dredging and desilting through to water intake and environmental impacts. Soils of Brunei are generally young, of sedimentary origin and highly erodable. On steeper slopes soil losses may be up to 350 tonnes per hectares per annum where vegetation is totally cleared; and Brunei rivers are depositing between 95,000 and 410,000 m3 per river system annually.
Best Practice Measures take a fourfold approach:-
Sustainable landuse planning in the form of Soils Hazard Risk maps and landuse guidelines;
Source controls and treatment using stormwater management and Erosion and Sediment Control Plans;
Regulatory Controls and Guidelines for Earthworks Specifications, new legislation and penalties;
Remediation and Management with Capital Works Programs for desilting/dredging, stabilization works and maintenance/upkeep.
Adoption of the new measures by government and industry will resolve exisitng problems of sedimentation and recover excess sediment from the rivers for secondary use in the construction industry.
CLIENT : WASAN MILLING COMPANY SDN BHD
LOCATION: WASAN RICEMILL COMPLEX, KG WASAN
KPI Sdn Bhd are the lead consultant for refurbishment and upgrade of the Wasan Ricemilling Complex to facilitate full processing of wet padi through to supermarket shelf ready packaged rice. The major components include:
Weighbridge and all-weather paddy receiving facilities;
New paddy dryer building with 4 nos x 30 tonne/batch capacity dryers using rice husk burners;
Dried paddy silos: 3 nos x 850 tonne capacity with fumigation control;
Automated conveyor system connecting from dryers to silos and into the ricemill;
Automated ricemill: 7 tonne/hour (56 tonne/day) installed into the existing warehouse with autopacking for 2.5, 5, and 10 kg thread bags;
Sensor monitored, automatic control system.
The completed complex is anticipated to be ready March 2025.
CLIENT: MIPR – Biodiversity Research and Innovation Centre
CAPITAL WORKS VALUE - $3.0 MILLION
KPI (formerly IEC Sdn Bhd) have been involved with the project from the outset, completing a Masterplan in 2006, and then lead consultant for the first stage implementation in 2009, providing architectural, engineering, quantity surveying and landscape architectural services, together with supervision of the Contractor during construction.
The first stage building is a multi-functional visitor and resources centre comprising 2,000m2 of floor space over three floor levels. It is a monolithic reinforced concrete structure designed in circular plan form with overarching steel louvered roof structures (sepals) around a central dome office (bud).
A central foyer and public reception leads to all facilities, minimising circulation floorspace and ensuring direct access to all components of the Centre. Views to the surrounding forest are framed with floor to ceiling glazing in the Exhibition Centre, large porthole windows in the laboratories, and expansive views from the roofdeck.
Core activities are for biodiversity research, education and conservation, with core facilities on the ground floor incorporating four laboratories, an inventory and database research room, Lecture Theatre, and Exhibition Centre. Business offices and meeting rooms are on the first floor and accessed via the roofdeck with covered walkway. Facilities are designed to operate independently of each other and can be leased to private sector for research and development programs.
Support facilities include a Surau, cafeteria, public rest rooms, reading areas and outdoor education spaces. Capacity of the building is approximately 400 persons at any given time, with a covered walkway from the bus-setdown to ensure all weather access for visitors. A raised earthworks platform ensures the building is above flood level, and addresses the main Labi road passing nearby. Easy road access and the range of public attractions will ensure high visitation and functionality for this internationally rated facility.
CLIENT: MINISTRY OF DEFENCE
CAPITAL WORKS VALUE: B$9 Million
KPI (formerly IEC Sdn Bhd) were appointed by the Ministry of Defence to provide Civil and Structural Engineering Services for the design and construction of bachelor accommodation for the 3rd Battalion Camp at Lumut, Seria. The brief was to meet all the requirements for unmarried soldiers quarters as well as administration, armscote and training facilities in a single complex. Access to the accommodation blocks was to allow for rapid deployment of troops for exercises or emergencies.
KPI were part of a consultant team that included Abdul Ghani Arkitek (Architects), Z-Arif Consultant (Quantity Surveyor) and Baharuddin PMS (M&E) charged with the implementation of this project. The team worked collaboratively to develop conceptual designs, construction budgets, detailed designs and tender documentation for the project as well as oversee the construction phase.
Building works comprised six accommodation blocks for the companies that make up the battalion. Each block is of reinforced concrete construction supported on piled foundations. The buildings are three storey walk up and the project includes outlying guardhouse and assault vehicle garages.
Civil works include finished earthworks, central court, roads, footpaths, arms/troop loading areas and recreation facilities.
A straightforward reinforced concrete design minimises the time required for construction and the lightweight roof is supported using prefabricated timber trusses. Project completed September 2007.