Financial feasibility plans, Cost-Benefit Analysis; Regional, District and Local Environment Plans; Development Control Plans; Sectoral Studies; Urban Design; park planning; town centre revitalisation; landscape enhancement schemes; Environmental controls/standards in urban development, e.g. flood studies, heritage studies, sustainability and ecological studies; geomatics and resources mapping.
CLIENT : THE GOVERNMENT OF BRUNEI DARUSSALAM
The site occupies 300 ha of beachfront land in the Brunei-Muara District of Brunei Darussalam. It comprises pristine coastal beaches, high quality secondary rainforest, kerangas and the Api-Api Wetland - a selected habitat for migratory wading birds. It also contains the remains of the Brooketon Colliery Site - Brunei’s historical coal mine.
IEC Sdn Bhd. were commissioned by the Brunei Government to study the natural resources and provide a Management Plan for the Park. Specialist studies were undertaken for wildlife habitats and vegetation communities to assess their requirements for sustainability and the suitable level of visitation by local residents. The studies culminated in a Master Plan for ongoing operations and maintenance.
Several rare and endangered species were identified during flora/fauna studies and these will be protected within the Management Plan.
The Park is currently being gazetted by the Government and Stage One Construction (B$1.5 million) will commence in 1996.
CLIENT: FISHERIES DEPARTMENT, MIPR
The Conceptual Design for the National Aquarium is based on recommendations of a Project Assessment Report undertaking by IEC. Findings of the report stated the most appropriate scale of development will be: a medium sized institutional aquarium of up to $35 million investment level, showcasing Brunei’s aquatic biodiversity and having good research, educational and conservation facilities.
The Masterplan was prepared over a six-month period after meetings with relevant government agencies, site investigations and planning/design work by the team of planners, architects, engineers, tourism consultants and Aquarium specialists.
A summary of management and costings are presented, refined from the Project Assessment Report. An outline of potential environmental impacts is also provided for more detailed investigations at the Design Development Stage.
CLIENT: FISHERIES DEPARTMENT, MIPR
Preparation of an “environmental friendly” Masterplan for land-based aquaculture activities on a 40ha gazetted site at Telisai. The Masterplan was prepared at an equivalent scale of 1:2,500 based on recently completed topographic site survey plans and used for presentation purposes, financial-capital works planning and further design/development documentation.
The Masterplan was prepared in line with Department of Fisheries aspirations to promote sustainable, profitable environment friendly and replicable aquaculture at the forefront of the industry development.
The Master-planning involved optimising the EPAQ cluster on the site in a configuration which enables supporting facilities to be included on the site, particularly recreational activities, restaurant, sales outlet and worker accommodation while maximising return for core aquaculture activities. Building layout was arranged to allow efficient circulation and servicing without being regimental or industrial in appearance. Building orientation will be aligned to optmise solar penetration for greenhouses.
A selection of different farm modules was adopted to provide a range of investor/owner opportunities within the Park. The selection was based on Bruneian investor interest profiles currently being considered by Department of Fisheries at the time of plan preparation.
A hierarchal circulation system will be adopted with service areas for transfer of goods to electric-carts used within the EPAQ clusters. Separate pedestrian pathways will pass through open spaces and connect with riverside walks, restaurant and workers accommodation.
Landscaping reinforced the hierarchal circulation system, screen off service areas and complement the recreational facilities, thereby enhancing the desired image of the Eco-Park as an environmental tourist friendly centre.
CLIENT : ENVIRONMENT UNIT, MINISTRY OF DEVELOPMENT
IEC were engaged with Arkitek Ibrahim to undertake a Feasibility Study and Master Plan for the National Zoo. Tasks for the study included:-
defining functions, overall size and suitable exhibits for a National Zoo within the context of ASEAN regional facilities.
select the most appropriate site from six locations suggested by government.
prepare a Master Plan describing major components, circulation systems, operation and management of the Zoo.
describe costs, staging, funding and potential revenue for implementation of the Master Plan.
Initial work involved establishing objectives and a functional brief for the zoo incorporating: a major leisure attraction; healthy environment for animals; facilities for scientific research; promotion of Conservation of the Natural World; and highlighting exhibits from the Indo-Malay region.
The Key Concept for the Zoo is to provide a broad range of exhibits grouped in bio-geographic settings or Biomes, representing a selection of the ecotypes found across all global continents. Animals are to be presented in settings typical of their Region, and the Biomes are located on the selected site in reference to their natural geographic settings: Indo-Malay region is on forested slopes, Himilayas on high ridgelines; African-Savanah on the valley floor.
Special exhibits will create focal points within Biomes to present a specific genera: reptile house, aviaries, catwalks, monkey island, and an aquarium. Enclosures are defined by invisible or transparent restraints including moats, level changes, and reinforced glass.
CLIENT: MIPR TOURISM BRUNEI
Kejuruteraan dan Persekitaran Integrasi Sdn. Bhd. was appointed by Brunei Tourism in March 2012 to prepare a summary assessments and maps of nature based tourism sites, agri-tourism sites, historic sites and existing Parks and Reserves in Brunei. The project was then expanded to include cultural, historic, geologic and diving tourism sites.
Sites have been grouped into six broad categories: (i) Tourism Entry Point; (ii) Parks and Reserves; (iii) Scenic Sites, Walking Trails and Recreation Precincts; (iv) Cultural, Historic, and Geologic Sites; (v) Agri-tourism; and (vi) Accommodation, Longhouses and Homestays. A summary Assessment of each existing tourism site is also included, providing site details, description and activities together with a summary assessment for tourism use and potential improvements to be listed and rated on a simple ten part scoring system based on information collected during fieldwork.
Brunei-Muara District has the most sites included with 90 (82 existing and 8 potential). There are 42 sites within Belait District, including 19 existing and 23 potential tourism sites. Tutong District has 36 sites, including 18 existing and 18 potential sites. Temburong District has 39 sites, including 27 existing sites and 12 potential sites.
Levels of mapping are outlined below:
•National Level: An overview map illustrating individual sires, nationally important features and tourist routes connecting through District boundaries.
•District Level: District level mapping helps to identify areas or clusters where there is scope to develop tourism initiatives in line with One Mukim – One Product objectives.
•Offshore Mapping: Map identifying offshore dive sites within Brunei’s waters.
•Precinct level: Five precincts are identified where tourism sites are highly concentrated. Each precinct may be developed as a private sector initiative to aggregate sites into a co-ordinated package.
CLIENT: BRUNEI SHELL PETROLEUM CO. SDN BHD (BSP)
Brunei National Oil Spill Contingency Plan required updated mapping of natural resource information and strategies for defense and clean-up of oil spills. IEC were selected for the work with support from University of Malaysia Sarawak, for their expertise in marine resources and conservation.
Approximately 180kms of coastline were studied including inner Brunei Bay offshore islands, patch reefs, wrecks and artificial reefs close to the surface. Field survey and aerial surveillance enabled mapping of coastal types,
wildlife habitats, mangroves and river deltas. Coastal landuse and cultural features were placed on the database together with planned infrastructure and oil related facilities.
Coastline types were described using Sensitivity Indexing from North American Oceanic Atmospheric Association, modified by IEC for tropical
environs and with temporal factors to allow for lifecycle, habitat changes, and wildlife migration routes.
All maps were converted to GIS MapInfo format for compatibility with GPS receivers and presented in hardcopy and electronic versions at scales ranging from 2,500 to 120,000.
Defense strategies against oil spills examined Best Practice promoted by ITOPF, EARL and AMSA to assess the characteristics of oil spills and weathering in tropical waters. Use of Dispersants was also evaluated for anticipated mixing of oil into the water column and impact on marine fauna and coastal habitats. This work resulted in production of Dispersant Maps for different tide conditions, and further studies on Toxicology of Dispersants in tropical waters.
Clean-up strategies were formulated according to size of spill, weathering characteristics, and site conditions of landfall so that response methods were appropriate to geomorphological type and coastal sensitivity rating.
Environmental Decision Guides were created for Offshore and Inshore Oil Spills ensuing response strategies incorporated key sensitivities and natural features.
Information from the project is presented as an Intranet site for use by Oil Spill Managers and International Response Teams.
CLIENT: Zoomry Industries and Trading Sdn Bhd
KPI Sdn Bhd was engaged to prepare an Investment and Business Plan Proposal to the Brunei Economic Development Board for the establishment of a Quartz Slab Manufacturing Plant using the resources from Tutong Silica Sand Deposits. The work included: assessment of the resource for suitability in production; finding readily accessible resources and development sites for the manufacturing plant; costing the industry development; and preparation of operational revenues for financial projections of the Scheme.
KPI took the lead consulting role in the project, covering all engineering aspects, and the preparation of an Environmental Impact Assessment which covered: mining and beneficiation of the silica resources; transport to the manufacturing plant; and the production of engineered slabs for the international market. Implementation of the project is expected to commence in year 2019 at a value of B$ 40 million.
CLIENT: Brunei Economic Development Board
Tutong Silica Sand Resources were investigated for their inherent qualities and suitability in industrial applications in Brunei. Fiftythree boreholes and 19 auger holes provided samples for analysis and together with mapping over an 8 km2 area generated information for 3D stratigraphic modeling of the resource. Characterisation of the sand was analysed with physical and chemical properties, and quantification of the resource providing the basis for it’s development potential.
Following on from the resource quantification to Industry Best Practice standard, IEC produced reports on developing a silica sands based industry in Brunei covering: A Program of Services; A Benchmark Royalty Price; Determination of Mining Area; High Potential Companies; and a Request for Proposals document. The Geological Report and supporting information was made available to prospective operators in the sector for realisation of the industry in Brunei.
CLIENT: Town & Country Planning Department,
MINISTRY OF DEVELOPMENT
Tutong district has a total land area of 1,216 km2, making up 20% of Brunei Darussalam. The vast majority of the District is forested – 935 km2 – and 290 km2 is either protected or in conservation forest. Population in 2010 was 51,770 and is expected to increase 45,000 people by 2025.
There are four main Objectives of the Tutong District Plan (TDP):-
Provide comprehensive guidelines and allocations for future landuse in Tutong District up to Year 2025.
Prepare short, medium and long term strategies, heading towards balanced resources allocation and sustainable development.
Create an integrated framework for investment and development that is complementary and compatible with other District Plans.
To improve, preserve and maintain the scenic natural surroundings, and to secure the valuable natural heritage of the District.
The district Plan lays out a vision for 2025: “Economically Connected, Environmentally Protected and with a Conducive Lifestyle”.
An expanded economy contributing 10% to Brunei’s non oil and gas, private sector Gross Domestic Product, will be driven by an intensification of primary and secondary industries, major infrastructure projects and enhanced connections with neighbouring Districts. The District’s natural features will be incorporated into a strengthened Environmental Protection network, and the impacts of human activity and development on these areas will be better managed and mitigated. The standard of living in the District will be enviable, and its residents will have access to high quality health care, education facilities, extensive recreation and leisure venues, and efficient government services.
The strategic planning framework for the District focuses on Tutong Township as the pre-eminent District Centre, with a new Coastal Harbour and expanded Township. The District Centre will be supported by a series of Emergent, Gateway and Outlying Growth Centres dispersed through all eight mukims. The most prominent of these Growth Centres will be a new major inland township with a population of 20,000 people at Lamunin-Menengah. An upgraded and expanded arterial road network will ensure interconnectivity between the District’s Growth Centres and improved linkages to Bandar Seri Begawan and Belait.
CLIENT: GOVERNMENT OF BRUNEI DARUSSALAM
TOWN & COUNTRY PLANNING DEPARTMENT,
MINISTRY OF DEVELOPMENT
The Interim Report for Telisai-Danau Local Plan presents findings several stages of the Local Plan preparation process. The investigation phase of work is now complete with sectoral studies summarised in the first part of the report. Results of the Task Group Forum provide clear intent for development of the LPA and a Vision Statement encompassing lifestyle aspirations for the community. Landuse suitability evaluation provides the basis for the Structure Plan for the LPA over the next 20 years and this is followed by evaluation of three town centre development scenarios to generate the preferred town centre concept for Telisai.
Sectoral Reports were completed by April 2005, and presented at the Task Group Forum late in April 2005.
Three options for the Town Centre were examined: two at the existing commercial area, and one on the highway at Kg. Telamba. First stage evaluation examined factors relating to: contextual suitability; and alignment with the 2025 Vision Statement. This resulted in the existing site at Telisai being preferred over the Telamba site.
CLIENT: GOVERNMENT OF BRUNEI TOWN & COUNTRY PLANNING DEPARTMENT
LEAD CONSULTANT : ASASREKA AKITEK
IEC were engaged for Study Management, landuse and environmental planning, and landscape architecture to complete the Interim and Final Phases of the Local Plan for Kampung Mumong.
The work at Interim Phase involved specialist studies in socio-economics, government structure and organisation, infrastructure and utilities, recreation and environment to produce three options for different growth strategies and evaluation to produce a Preferred Concept Plan.
The Final Phase of work involved production of the Local Plan and a Development Plan for the community describing infrastructure and facilities required to create the framework for implementing the Local Plan. To further strengthen the identity of Mumong and provide economic catalysts for development, Action Area Plans were prepared identifying key components to be undertaken by private sector and government namely: Wholesale Trade and Agricultural Centre, Riverfront Development, Local Commercial Centres and a Highway Service Centre.
Cost estimates for proposed development and infrastructure were prepared together with initiatives for private sector involvement and revenue sources for Brunei government.
CLIENT: DEPARTMENT OF TOWN AND COUNTRY PLANNING, ENVIRONMENT UNIT
LEAD CONSULTANT : KBP
IEC Sdn Bhd. were engaged to provide proposals for landscape improvements and revitalization of the central Business District. Works involved analysis and evaluation of the existing open spaces and outdoor venues to provide a framework for Urban Design and Landscape of the Capital City. Precincts of cohesive landuse activities were identified then guidelines drawn up for their use. The study culminated in providing an Overall Plan for revitalization supported by recommendations and detailed schemes for major components.
These included BSB Waterfront, Jalan Sultan Pedestrian Precinct, Jalan Robert Mall, Yayasan Park, SOAS Mosque surrounds and Sg. Kianggeh Tamu site.
The project also involved proposals for the Gadong Commercial Centre and the Riverside Park adjoining Sg. Kedayan, a major urban waterway linking the two centres.