"Our assessments cover water, soil, air, noise, waste management, traffic and community engagement, giving clients a complete picture of a project’s environmental and social impacts.
- Environmental Impact Assessments (EIA) and Environmental Management and Monitoring Plans (EMMP)
- Water quality studies for rivers, coastal waters and aquaculture sites
- Soil and contaminated land assessment and remediation
- Air quality and noise monitoring and impact assessment
- Waste management: wastewater, sewerage and solid waste schemes
- Traffic impact assessment
- Community and stakeholder engagement, including public consultation and socio-economic surveys"
CLIENT: Public Works – Department of Water Services
Completed: February 2022
KPI Sdn Bhd was commissioned by the Ministry of Development with the Department of Water Services as the representative to prepare an environmental study of Manganese and other mineral contents along Tutong River.
There are several objectives of the work:
Provide a response plan to the elevated levels of Manganese at the Kuala Abang intakes.
Undertake a water quality investigation for other parameters of importance
Recommend a monitoring & early warning system for pollutants
Assess infrastructure and socio-economic measures to improve river water quality
CLIENT: FISHERIES DEPARTMENT, MIPR
The work carried out by IEC have yielded a large resource of information regarding the physical conditions at Pulau Kaingaran and Buang Tawar. This information has been analysed and interpreted to show site suitability, allow comments on sustainability and give a range of recommendations for improving and maintaining aquaculture production at the two sites.
A number of experiments were designed and run in order to study physical, chemical, biological and ecological parameters of the river quality at ambient levels and in areas affected by aquaculture. These were repeated monthly for a period of six months. Hydrological studies over the same period investigated the patterns of currents in the river and the separation and mixing of water masses in the river over daily and monthly tidal cycles.
Results are discussed with reference to international water quality standards and known toxicological limits of fish species. The suitability of the areas for aquaculture is confirmed, though ongoing monitoring is recommended. The impact of excess food and increased sedimentation below cages, and the need to reduce losses is discussed.
Other pollutants released from aquaculture operations will also have long term impacts on the environment, even though they may be in only small concentrations, most importantly nitrites and ammonia.
Based on these results, recommendations are made for maintaining water quality, reducing losses of excess food and other nutrients, identifying factors for new the siting of new operations and improving efficiency of operators.
Following on from the Ongoing Monitoring Procedures training course delivered by IEC to Fisheries staff, details of the ongoing monitoring program are given with recommended sampling frequency and parameters for ongoing testing.
Gravity Sewer and Vacuum Collection Pot under walkways at Bolkiah “B”.
Bolkiah “A” Blower House and Treatment Plant.
Vacuum Pump Station and Generator Set Building for Bolkiah “B”.
CLIENT: Retired Tyres Pty Ltd, Australia
Waste to energy for this project involves conversion of end-of-life tyres into biodiesel and electricity. A fast-batch continuous pyrolysis plant will gasify 20 tonnes of tyres per day to produce 9 tonnes of biodiesel, 2 MW of electricity, two tonnes of recycled steel, and four tonnes of char. All end products are suitable for re-use or reprocessing back into industrial components – no landfilling is required. Other feedstocks include municipal waste, unrecyclable plastics, oily-wastes and sewerage sludge.
KPI have provided master-planning and facilities design for three project sites in Regional Australian cities: Moree, Casino and Geelong. All have waste disposal problems, and the potential for community grid power supply to ‘green industry zones’. Rtt is currently obtaining permits to build and will install the first pyrolysis retort in June 2016.
CLEAN UP BRUNEI CAMPAIGN 1997
ROLE: IEC Sdn Bhd, ORGANISING COMMITTEE
Clean Up Brunei Campaign was launched in conjunction with “Clean Up the World” – a global initiative started by the Australian yachtman, Ian Kiernan. Major activities in Brunei included:-
tree planting at Berakas Forest Reserve by secondary school students (1,000 trees over 2 hectare area),
clean up of beaches and kampong by approximately 3,500 volunteers from local community groups, schools and businesses.
collection of rubbish by contractors and disposal to landfill sites.
Public Media coverage was very good – numerous articles in the Borneo Bulletin, a series of radio interviews, School Information Packs, banners hanging from helium blimps and a 35 minutes environmental mini-documentary aired into Singnet satellite fro the ASEAN Region. School participation organised through the Ministry of Education also assisted in raising the profile of the Campaign.
Garbage collected for 1997 was predominantly plastic, metal containers, floating debris from water villages and some construction rubbish. An estimate of the total is approximately 120 tonnes disposed at the Municipal Landfill site. Selected metal products were collected by the Recycling business operating in Brunei, and several schools have now established recycling programs in conjunction with the Campaign.
This was the 3rd consecutive year that Brunei has participated and it was encouraging to see good response from the local community organised by the Penghulus and Ketua Kampongs around the Brunei-Muara and Belait districts. Several activities were possible throughout the year as a result of sponsorship funding raised from the Private Sectors.
CLIENT : BRUNEI SHELL PETROLEUM CO. SDN BHD
IEC were commissioned by Brunei Shell Petroleum to undertake assessment and design for landscape rehabilitation of a 40 metre wide corridor containing a high pressure gas main from Jerudong Gas Metering Station to Berakas Power Station approximately 11 kilometres. The corridor passed through several types of coastal forest or heath and crossed approximately ten waterways. Bedrock and soils were generally light, friable and highly eroded requiring backfilling, stabilization and runoff control.
The concept for the rehabilitation was to reinstate the pipeline route to a condition similar to the surrounding environment I.e. secondary forest and heath. Service access was unnecessary while emergency access would clear minor vegetation over the pipeline. A range of treatments were devised which utilized existing materials on site (e.g. felled logs and boulders) with organic based geofabrics, limited amounts of prefabricated drains and culverts, and extensive planting. Stream crossings were altered to allow free passage of water or upgraded with more appropriate bank stabilization materials. Extensive hydroseeding of mixed grasses together with planting of indigenous trees and shrubs strategically placed ensured rapid revegetation of the pipeline route.
Construction was completed over nine months at a total cost of $1.0 million. The pipeline route can now only be traced by the marker sign through the forest.
CLIENT: Istana Projects Section, Ministry of Development
CAPITAL WORKS VALUE - B$2.5 Million
The project involved siting, design and construction of Vacuum Pump Stations for Sewerage Schemes on new water village housing on Sungai Brunei. The schemes included transfer of household waste via vacuum pumps to a central pump station and treatment in a packaged tank farm. Total population of over 3,000 residents required three separate treatment plants, located close to the river.
Two schemes managed to site the pump station and treatment plant on land, however the third scheme at Kg. Sungai Bunga had no flat land closeby. The outcome was a pump station and treatment plant located over water at the upriver end of the development.
Design of the building was in keeping with the residential style, and perpendicular to the shore to enable servicing via barge. Noise inhibitors were utilised for airblower pumps, and odour scrubbers ensured suppression of foul smells.
A standby genset within the building ensures continuous running of the plant, with removal of sludge every 12 months. Treated effluent is discharged to the river and complies with Brunei’s strict environmental regulations.
Monitoring of discharge is undertaken regularly by an independent laboratory.
CLIENT : DEPARTMENT OF PUBLIC WORKS
END-USER: DEPARTMENT OF AGRICULTURE
CONTRACT SUM B$7.6 million
Scheme evaluation involved determining the optimal supply and distribution network to 406 ha of mixed farming allotments. The source of water was an existing low lying reservoir at Imang, some 10 km from the farm allotments.
Following consideration of engineering practicalities, water quality, endusers, economics, weather regime and dam capacity, major components of the scheme were selected. They include:-
an intake structure and pump station equipped with 3 x 105kw submersible centrifugal pumps.
11kv substation and control centre.
a rising main of 175m running up to a ridge top 10,000m3 concrete holding tank.
an 800mm dia GRP gravity bulk supply main connecting to the agricultural areas.
a 16.4km of uPVC gravity reticulation network with metered water service valves connecting allotments.
Raw water from the reservoir will be filtered and pumped to the holding tank at 220 litres/sec and delivered to the allotments over a 12-hour period at a minimum head of 16 metres. A SCADA Telemetry System will enable monitoring a control of the system.
Relative advantages of the scheme are: comparatively high residual pressures within the network; only one pumping station; simplicity of construction; easily expanded low level of manpower to operate; and metered valves at allotments enable automatic shutoff and gauging of waterflow for consumer billing.
The project is awaiting calling of tender for anticipated construction in 2002 and commissioning in 2003.
CLIENT : THE GOVERNMENT OF BRUNEI DARUSSALAM
Kampong Ayer, the largest water village in the world, is home to some 30,000 Bruneians. The water village is situated along the banks of the Sungai Brunei, adjacent to the Country’s capital, Bandar Seri Begawan.
Following an earlier Master Plan Study by Scott & Furphy in 1986, IEC Sdn Bhd. (formally, CMP-Hamzah) were appointed by the Government of Negara Brunei Darussalam to prepare a pilot vacuum sewerage system for 400 homes in Kampong Ayer.
The resultant design employed traditional gravity plumbing from conventional WC’s installed in each home to purpose built vacuum chamber constructed in the shallow waters of the Sungai Brunei.
The systems vacuum chambers are then connected by a series of vacuum sewer mains, suspended beneath the walkways, to a land based collection and forwarding station.
A social study to determine the local communities needs and acceptance to the proposed sewerage scheme formed an integral part of the project.
CLIENT : THE GOVERNMENT OF BRUNEI DARUSSALAM
Kampong Ayer, the largest water village in the world, is home to some 30,000 Bruneians. The water village is situated along the banks of the Sungai Brunei, adjacent to the Country’s capital, Bandar Seri Begawan.
This unique style of settlement has developed in Brunei since the 15th century and is now equipped with most modern utilities and infrastructure. As part of this development IEC Sdn Bhd. (formally CMP-Hamzah) were engaged by the Government of Negara Brunei Darussalam to design and document a pilot solid waste collection system for Kampong Ayer.
The implemented system involves waste collection by Mobil Garbage Bin (MGB’s) from individual homes. MGB’s are then collected by small powercarts that transverse an upgraded walkway system and deliver the waste to purpose built transfer stations located on the river front. From here waste is collected by specially designed boats and transported to the town wharf for further transfer to the municipal refuse landfill site.
CLIENT: BRUNEI SHELL PETROLEUM CO. SDN BHD (BSP)
An Ocean Bottom Cable Seismic Survey was undertaken over Champion Oilfield during September 2002. BSP engaged IEC to complete an environmental assessment of the work including: a scoping report to determine threshold levels for impacts on coral reefs, a desktop environmental assessment, and field verification of seismic airguns and cable laying operations. Results of the field trials enabled selection of mitigation measures and management guidelines for the main contractor (WesternGeco) to follow during the survey acquisition period.
Field Verification Trials were undertaken during July 2002 with results and mitigation measures for the survey presented to the Brunei Government. The trials included recordings and observations of: maximum airgun pressures, captive fish response to airgun signals, reef fauna response to airgun signals, and cable laying and recovery operations. Transects of coral reef and its associated fauna were undertaken before and after the trials to determine impacts of the airguns and cable laying.
In support of the environmental assessment, IEC was also engaged to undertake a Roxann Survey for coral reefs in the survey area, and Stakeholder Consultation for government agencies, and other affected parties including commercial and local fishermen active within the survey area boundaries.
Based on the minor, insignificant impacts of the seismic airguns and the OBC cable to the reef and their associated fauna, a recommendation was made to go ahead with the OBC survey. Untested, but potential impacts such as on fish or coral larvae were avoided during the survey by the contractor during spawning periods and when siting marine mammals closer than 500 metres to seismic vessels.
CLIENT: PWD Department of Water Services
KPI was commissioned by DWS for river water investigation upstream of treatment plant intakes in order to:
Provide a response to elevated levels of Manganese and other pollutants;
Recommend a monitoring and early warning system for pollutants at the treatment plants;
Recommendations from Volume 1 included: waterway diversions; landuse modifications; increased development controls; water intake changes; pH raising devices at the water intakes.
Recommendations from Volume 2 covered:
Water quality improvements at the water treatment plants and outlying reservoirs;
Infrastructure for improving water quality in the treatment plants and distribution network;
Design for a Water Quality Monitoring System for Bukit Barun WTP;
On-site sludge disposal scheme for Bukit Barun WTP.
CLIENT: BRUNEI SHELL PETROLEUM CO. SDN BHD (BSP)
Surface geochemical survey for oil and gas deposits involves placing small permeable sorbers into the soil profile at approximately one kilometre spacings Sorbers are collected after 17 days and analysed for hydrocarbons they have absorbed. Distribution maps drawn from the information can be analysed with other data already collected to identify suitable locations for exploration drilling.
The method does not require clearing of vegetation and therefore suited to Labi Hills – an area of mixed dipterocarp and peatswamp forests in the Belait District of Brunei.
Stakeholder Consultation for the Surface Geochemical Survey focused on government agencies, local authorities and the local community. The consultation process for the survey was designed to:-
Inform stakeholders regarding the project activities and its environmental effects.
Identify and address any community concerns through feedback and discussion.
Enable BSP to modify the project implementation to accommodate valid stakeholder concerns.
Consultation commenced with preparation and distribution of Information Packs to government agencies. The relatively minor environmental impact of the survey resulted (compared to seismic or land gravity methods) in the Information Packs containing the Environmental Assessment, therefore shortening the government endorsement process.
A Forum was conducted with affected community groups, local government services, penghulus and ketuas kampong from the Labi Hills area. This briefed community leaders on the Program and identified opportunities for local input to the project. Forestry contractors and farmers active in the Labi Hills were also briefed on the project and movements of the survey teams within licensed areas.
A community briefing was held at the Balai Raya where the survey team was introduced and a demonstration given of installation the sorbers. A close relationship was attained rapidly between all parties and the survey team was able to complete their work without disruption from the small community and other users of the Forest Reserves.
CLIENT: BRUNEI SHELL PETROLEUM CO. SDN BHD (BSP)
Oil industry agencies and oil spill responders around the world are currently deliberating the success of pre-approving the use of dispersants to treat oil slicks in near-shore and shallow waters. The decision rests on understanding the effectiveness of dispersant operations, the long term fate and effects of dispersed oil, and the effects of oil slicks and shoreline oiling on critical fisheries and marine species. Knowledge leading to this critical decision point vary within each country and are often dependant on local conditions and species.
The aim of the Dispersant toxicology Study is to determine impacts of dispersant/oil mixtures on sensitive tropical environments in order to recommend dispersant use zones around coral
reefs, mangroves and offshore open waters. The study seeks to emulate real-time conditions by placing coral samples back into the field after treatment and testing mangroves in-situ. Fish, prawns and zooplankton are observed in seawater tanks at the field study center at Banggi Island off Sabah. Changes to the marine life are observed over a 30 day period to count mortalities or abnormalities arising from the treatment. Dispersants tested in the study are Corexit, Shell VDC, and Dasic Slickgone.
Results of the study are anticipated mid-2002 and will form the basis of an industry wide paper for the suitability and application of particular dispersants in tropical waters for International Response Agencies.
CLIENT: BRUNEI SHELL PETROLEUM CO. SDN BHD (BSP)
DEPARTMENT OF FISHERIES
The issue of overtrawling in Brunei centres around commercial fishermen seeking to expand their fishing grounds, and oil industry concerns over safety and environmental issues from damages to seabed structures.
IEC were requested to examine existing regulations and practices on fishing over seabed pipelines, then draw from international experiences to present scenarios for Brunei that improve fishing access without compromising safety and operational requirements of the Oil Industry.
Interviews were held with commercial fishery operators and Department of Fisheries officers to obtain current practices; and details of trawling gear used in Brunei. Overseas experience, particularly in the North Sea revealed a long established format for determining “trawlability” of pipelines, and Trenching Guidelines to calculate potential damages from trawling gear. Latest methods for improved safety include warning systems placed on board vessels using GIS location devises to advise of close proximity to the pipelines.
Options suitable for Brunei waters include: changes to pipeline design; new safety factors; modifying fishing gear on vessels; on board warning devises; and marine transponders showing vessel location. The most appropriate solution is a combination of scenarios which improve safety provisions and instill a “Duty of Care” on fishermen to be aware of the hazards of fishing close to seabed structures.
Results of the investigation will be incorporated into a Strategy Paper describing the way forward for co-incidental use of the seabed by fishermen and the oil companies.
CLIENT: BRUNEI SHELL PETROLEUM CO. SDN BHD (BSP)
A new scheme for discharge of Produced Water is proposed by BSP in response to corporate environmental policy and Draft Discharge Standards from Brunei Government. The preferred scheme is via undersea pipeline to discharge 6.0km offshore.
IEC were engaged to undertake Stakeholder Consultation to identify affected parties; (government and private sector) inform them of the proposal; seek their feedback and address their concerns. This would enable BSP to adjust the proposed scheme and obtain consensus support for the project to proceed.
Stakeholder Information Packs were prepared in English and Malay and once feedback was obtained a Government Forum was held to clarify issues and provide response from BSP. Over 28 government agencies were involved, with subsequent consultation of commercial and local fishermen operating in the vicinity of the discharge point. The process resulted in confirmation of the preferred scheme and an outline for monitoring and reporting on the offshore disposal scheme when commissioned.