Comprehensive needs assessments; market analysis and feasibility studies; sustainable agricultural practices; resources management; risk management and disaster preparedness; processing, packaging and storage solutions.
CLIENT: Department of Agriculture and Agrifood
Completed: April 2021.
The Imang Reservoir improvement project was a 15-month program. KPI Sdn Bhd was the Engineering Consultant whereas the Excavation and Expansion Contractor was Foundation Contractor & Engineering (FEC) Sdn Bhd.
Description of Works:
Construct temporary haul roads into outer reaches of the reservoir
Establish excavated material processing areas on reservoir's perimeter
Remove perimeter and floating weed from 72 hectares of the reservoir using mechanised weed harvester
Install sediment reduction measures
Excavate 554,000 cubic metres from the lakebed to increase reservoir's storage capacity
Dispose excavated material to an approved location
Grubbing out and removal of vegetation on reservoir's perimeter and embankments.
Project's Benefits:
Increase reservoir's storage by 1,318,000 cubic metres (15%)
Improve water quality for irrigation
Additional irrigation water for rice scheme
Improve irrigation supply during drought period.
CLIENT: PWD – Drainage and Sewerage
Completed: March 2012.
Principle objectives of the project are to: identify major sources of sediment transport and deposition through five major rivers; determine implications for landuse and flooding; identify Best Practice Measures; define capital works for rehabilitation.
The estimated annual cost of sedimentation to the Brunei economy is B$4.88 million from dredging and desilting through to water intake and environmental impacts. Soils of Brunei are generally young, of sedimentary origin and highly erodable. On steeper slopes soil losses may be up to 350 tonnes per hectares per annum where vegetation is totally cleared; and Brunei rivers are depositing between 95,000 and 410,000 m3 per river system annually.
Best Practice Measures take a fourfold approach:-
Sustainable landuse planning in the form of Soils Hazard Risk maps and landuse guidelines;
Source controls and treatment using stormwater management and Erosion and Sediment Control Plans;
Regulatory Controls and Guidelines for Earthworks Specifications, new legislation and penalties;
Remediation and Management with Capital Works Programs for desilting/dredging, stabilization works and maintenance/upkeep.
Adoption of the new measures by government and industry will resolve exisitng problems of sedimentation and recover excess sediment from the rivers for secondary use in the construction industry.
CLIENT: MIPR, Biodiversity Research and Innovation Centre
Works Value: B$200,000
CMPS&F were commissioned to design, fabricate and install exhibition materials for the first exhibition: “Exploring Brunei’s Forest Biodiversity”. Components of the exhibition comprise: a main exhibition booth; staircase wall galleries; specimen display cabinets; free standing display kiosks; wall mounted touch screens for educational programs; 24 touch screen for inter-active information and loose furnishings for a reading room.
Computer software incorporated information/ education on Brunei biodiversity, interactive educational games for primary school students and short documentaries on biodiversity conservation.
The exhibition was installed over a two-month period in February-March 2014, and is open for viewing during Brunei Government business hour.
CLIENT: MIPR - WILDLIFE DIVISION
WORKS VALUE: B$300,000
MIPR Wildlife Division will commence enforcement activities shortly and require facilities for animals confiscated from markets and residences, injured animals and those stressed from mishandling.
On a two hectare site at Sinaut existing buildings were converted to vet clinic, food preparation areas, offices and animal enclosures. A separate briefing pavilion was constructed for visitors to the site.
The first stage animal enclosures included an otter pond, sunbear enclosure, four mammal enclosures, and aviaries for up to 50 birds.
A secured animal recovery house was also built that incorprated terrariums for reptiles.
Circulation paths and water features were built for ease of servicing enclosures and to provide for visitors to the Centre.
CLIENT: FORESTRY DEPARTMENT, MIPR
CONSTRUCTION COST ESTIMATE: B$3.8 MILLION
In March 2012, IEC presented a Masterplan for the Development of a Mangrove Education Centre for Brunei. Components are to include education, research and development and ecotourism facilities for primary and secondary schools, the Brunei community and international visitors.
The Visitor Centre is designed on pier stilts over an inter-tidal zone close to the forest. It is predominantly single storey with a central mezzanine level creating a high point in the lateral layout Feature walls reinforce the lineal quality of the building and all clear storey lighting into the interior.
A central lobby leads to classrooms and theatre in the north wing, with offices, exhibition and retail in the south wing, together with a photographic laboratory and small retail space. Total floor area is 1,300m2 and the building capacity is approximately 350 persons.
Outdoor facilities include an outdoor classroom for 60 students, forest boardwalk with wireless learning trail, wildlife and bird viewing hides, lookout tower and plant nursery for rehabilitation of mangrove areas in Brunei.
CLIENT: FORESTRY DEPARTMENT, MIPR
Brunei Tropical Biodiversity Centre will be the National Centre containing: a genetic inventory of Brunei Forests; records and ongoing programs of biodiversity research; and initiatives for non-timber product development in Brunei Darussalam. Activities carried out at the Centre and surrounding dipterocarp forest will increase international recognition of Brunei’s forest resources, its research activities and conservation programmes. An integral part of this development will be attracting visitors to the site to promote environmental education and awareness of the value in non-timber products from dipterocarp forests. It is anticipated that the TBC will become one of the key eco-tourist attractions of North Borneo.
The setting for the complex will be 500 ha of Andulau Forest Reserve. It provides opportunity for a Botanic Garden to support the TBC core components and create a “critical mass” of biodiversity related activities on the site. This will enhance the identity of the TBC and its location within the Forestry associated area of Andulau.
Activities of the TBC will be organised from a cluster of buildings containing Administration, staff offices, an exhibition space, presentation/ meeting rooms, and cafeteria. An Interpretative Information Centre will provide displays, a small library and database for biodiversity resources and non-timber forest product development in Brunei. A laboratory for tissue culture of seedlets, forest pest and disease surveillance and genetic research will also be part of the Central Complex.
CLIENT: GOLDEN CORPORATION
CONSTRUCTION COST ESTIMATE: B$ 22.23 MILLION
Another 233 hectares have been leased to Golden Corpn for production of Black Tiger Prawn (Penaeus monodon). KPI prepared a Masterplan that creates interconnecting tidal canals to bring oxygenated water into the farm for pumping into short term conditioning reservoirs, then distribution flumes supplying 129 ponds each averaging 7,500m2 surface area.
Wastewater will be processed through aerated treatment basins with three days residency to achieve Brunei Pollution Control effluent standards, Daily water consumption for Zones C to E is 328ML for 30% water replacement. Using 500L/sec pumps in sequence, each pump
lifting 21,600m3 per 12 hour shift. New 11kv substations are required for pumps, aerators,
and lighting for the pond areas. Each farm module has a service building containing pumps, water treatment, and aeration system. A centralised managers office and staff quarters are located near the entry gate with a Visitor Centre proposed overlookingthe 450 hectare facility. When complete the facility will produce 4,000 tonnes of shrimp annually for local consumption and export.
CLIENT: GOLDEN CORPORATION
Objective:
1. To provide intensive prawn farming facilities capable of production yields upwards from 15 tones per hectare per annum.
2. To provide facilities suitable for prawn species favoured by the Department of Fisheries.
3. To plan wastewater treatment facilities capable of discharging into receiving waters in compliance with Brunei’s Pollution Control Guidelines.
Layout:
Penyatang Aquaculture Masterplan comprises 498 hectares of land based facilities dedicated to intensive shrimp culturing, and a research centre for commercial development of fisheries resources in Brunei.
The intensive shrimp culturing is undertaken in five farm zones, each approximately 80 hectares in size. Production ponds are 7500m2 on a grid layout using open PE lined ponds with partial recirculating water supply. Each of the farm zones has space set aside for water balance/inlet treatment ponds, staff accommodation and offices, feed and equipment storage buildings and a wastewater treatment system.
CLIENT: BEDB/ GOLDEN CORPORATION
CONSTRUCTION COST ESTIMATE: B$ 84.5 MILLION
Masterplan and Detailed Design for Panaeus Rostris Prawn Production Farm over a 373 hectare green-field site. Production ponds of 7,500m2 totaling 187 ha surface area, with four conditioning reservoirs over two phases of development.
Seawater delivery is from a coastal intake and 2.5 km low head pumping into the conditioning reservoirs. Supply into production ponds is via pipeline with 20% replacement volume per day, requiring 378ML over a 12 hour period.
Annual production of the facility is projected at 4,788 tonnes per annum, of 60-65 gms fresh shrimp for export.
Earthworks amounting to 850,000m3, 3 km of roads, 2 bridges, 2x 11kv substations, pump station, drainage system, and wastewater treatment to be installed over a 48 month construction period.
CLIENT: FISHERIES DEPARTMENT, MIPR
Fisheries Department is looking to establish a marine finfish hatchery to produce fingerlings of marine finfish species, particularly groupers at one of several sites belonging to the government. IEC undertook selection of a suitable site, production of a Site Development Plan including layout of the facilities, and cost estimate of the facility.
Fisheries Department sees the proposed hatchery as a mechanism to support aquaculture development in Brunei by:-
Developing/adapting marine finfish hatchery technologies for application in Brunei: the hatchery will have an R&D focus.
Providing these technologies to the private sector: the hatchery will have a technology adoption/training role.
Producing high-quality high-health fingerlings to support start-up of private sector marine finfish aquaculture operations.
The hatchery building comprises a central split arch steel frame running east-west, with two intersecting single arch frames running north-south. Steel frame trusses sit on reinforced concrete columns and roof beaks running the perimeter of the hatchery. This provides column free spaces for the nursery; larval rearing, mass cultural and broodstock thereby enabling flexibility for tank arrangement.
Core components for culturing food, larval rearing and quarantine will be in air conditioned spaces with the main building. These functions are clustered together for efficiencies in plumbing and ducting. This also simplifies building extensions, through the ability to add onto the broodstock and nursery components without disrupting core activities.
CLIENT: FISHERIES DEPARTMENT, MIPR
The major purposes of the project are to:-
Select a site which is readily available for development.
Select an appropriate sized scheme for Brunei in the context of a rapidly expanding market.
prepare overview project feasibility for potential investors and show potential financial returns for government.
Site selection favoured a 5.2 ha site at Pantai Meragang. The site is well placed for access, utilities, seawater and has low bio-security risk.
Currently, Brunei is seeing the introduction of Marine Finfish in land-based fish-farms. Pilot projects are underway with private operators assessing potential rapid expansion.
CONCEPT
The concept for the Marine Finfish Hatchery is to provide a facility for the supply of SPF eggs, fry, and fingerlings for grow out operators in Brunei and the SE Asian region.
Target production figures will be 15 million fingerlings per year cultured in four cycles of 75 days. Fry and fingerlings will be offered at 30 days and 75 days culture equating to 30mm and 75mm length. It is anticipated that 5-7 million fry will be taken up by the local operators will be offered onto the fish culturing facilities in neighbouring Malaysia, Thailand and possibly Taiwan.
Business start up units will be established adjacent to the core facilities to provide the opportunity for public-private partnerships in new species development or commercialisation of species for the rapidly expanding marketplace. The first of these units will be setup within the main building and can be used for overflow production at the outset of the project.
CLIENT: FISHERIES DEPARTMENT, MIPR
Masterplan Objectives
1. To provide intensive prawn farming facilities capable of production yields upwards from 15 tonnes per hectare per annum.
2. To provide facilities suitable for prawn species favoured by the Department of Fisheries.
3. To utilise existing infrastructure and utilities being completed under existing construction contracts.
4. To limit development/production areas to Zones A and B and the cleared portion of Zone C, totalling 178 hectares within the 459 hectares.
5. To plan wastewater treatment facilities capable of discharging into receiving waters in compliance with Brunei’s Pollution Control Guidelines.
Concept
Penyatang Aquaculture Masterplan comprises 178 hectares of land based facilities dedicated to intensive shrimp culturing, and a research centre for commercial development of fisheries resources in Brunei.
The intensive shrimp culturing is undertaken in two farm zones, each approximately 80 hectares in size. Production ponds sizing and final layout will be according to the farm operator preference, however for master planning a grid layout using open PE lined pond has been adopted. Each of the farm zones has space set aside for water balance/inlet treatment ponds, staff accommodation and offices, feed and equipment storage buildings and a wastewater treatment system. This effectively gives two distinct farm areas for lease-out by the Department of Fisheries.
CLIENT: FISHERIES DEPARTMENT, MIPR
The primary objective is to prepare a comprehensive development plan for land-based aquaculture facilities, specifically high value fish, in the vicinity of Kampong Danau, Tutong District.
A secondary objective is to prepare the Masterplan according to the Department of Fisheries aspirations to promote sustainable, profitable and environmentally friendly aquaculture facilities in Brunei.
The Scope of Work includes:-
natural features survey around the 14 ha site at Kampong Danau to merge with the topographic survey by others
Vegetation study, down to genera of canopy and sub-canopy trees at Kampong Danau
Identification of fish aquaculture activities (including hatchery and grow-out) which are environmentally benign or with low environmental impact.
Preparation of three options to develop the area, evaluated by cost/benefit analysis considering economic viability and returns to government
Masterplan layout for the preferred option, including sub-division plan for areas to be leased from government
Infrastructure layout including internal roads, electrical supply, freshwater and seawater supplies, drainage and telephone connections.
CLIENT: FISHERIES DEPARTMENT, MIPR
The Conceptual Design for the National Aquarium is based on recommendations of a Project Assessment Report undertaking by IEC. Findings of the report stated the most appropriate scale of development will be: a medium sized institutional aquarium of up to $35 million investment level, showcasing Brunei’s aquatic biodiversity and having good research, educational and conservation facilities.
The Masterplan was prepared over a six-month period after meetings with relevant government agencies, site investigations and planning/design work by the team of planners, architects, engineers, tourism consultants and Aquarium specialists.
A summary of management and costings are presented, refined from the Project Assessment Report. An outline of potential environmental impacts is also provided for more detailed investigations at the Design Development Stage.
CLIENT: FISHERIES DEPARTMENT, MIPR
Preparation of an “environmental friendly” Masterplan for land-based aquaculture activities on a 40ha gazetted site at Telisai. The Masterplan was prepared at an equivalent scale of 1:2,500 based on recently completed topographic site survey plans and used for presentation purposes, financial-capital works planning and further design/development documentation.
The Masterplan was prepared in line with Department of Fisheries aspirations to promote sustainable, profitable environment friendly and replicable aquaculture at the forefront of the industry development.
The Master-planning involved optimising the EPAQ cluster on the site in a configuration which enables supporting facilities to be included on the site, particularly recreational activities, restaurant, sales outlet and worker accommodation while maximising return for core aquaculture activities. Building layout was arranged to allow efficient circulation and servicing without being regimental or industrial in appearance. Building orientation will be aligned to optmise solar penetration for greenhouses.
A selection of different farm modules was adopted to provide a range of investor/owner opportunities within the Park. The selection was based on Bruneian investor interest profiles currently being considered by Department of Fisheries at the time of plan preparation.
A hierarchal circulation system will be adopted with service areas for transfer of goods to electric-carts used within the EPAQ clusters. Separate pedestrian pathways will pass through open spaces and connect with riverside walks, restaurant and workers accommodation.
Landscaping reinforced the hierarchal circulation system, screen off service areas and complement the recreational facilities, thereby enhancing the desired image of the Eco-Park as an environmental tourist friendly centre.
CLIENT: GOLD OCEAN INTERNATIONAL
Chenzhou is a rapidly developing city in Hunan Province. The city comprises four million residents and is primarily an agricultural export/services centre at the southern gateway to Hunan from Guangzhou.
The Park site is 10km from Chenzhou City, Hunan with river environs offering a high quality landscape suitable for leisure and tourism activities. Riverfront locations within the site shall be dedicated for a waterpark, picnic facilities and accommodation. Existing mandarin orchards will be retained where possible.
IEC Sdn Bhd has been engaged for the Masterplan and First Stage Trial Farm layout.
An Integrated land-based aquaculture facility utilising proven technology and incorporating brood stock, hatchery/nursery, logistic centre, and Eco-Type clusters, are the aquaculture components.
Supporting components will include: a Centre Complex with Visitor Centre showcasing the production methodology; associated recreational facilities (waterslide park, picnic areas) and site for a feedmill.
These components will be incorporated into the layout to provide a comprehensive Development Plan over 100 ha in area.
The main technology is the aquaculture technique for the grow-out of fish known as the Fish Protech-Controlled Aquaculture System. It is an Australian developed technology which is specifically designed for the production of tropical, freshwater and marine fish under a controlled environment with regulated temperature and treated water, for the purposes of commercial finfish production.
Investor shareholdings for Business Farm units which can be owner operated with the support of Aquaculture Technology Australia, or managed by Gold Ocean on behalf of Investors.
CLIENT: FISHERIES DEPARTMENT, MIPR
The work carried out by IEC have yielded a large resource of information regarding the physical conditions at Pulau Kaingaran and Buang Tawar. This information has been analysed and interpreted to show site suitability, allow comments on sustainability and give a range of recommendations for improving and maintaining aquaculture production at the two sites.
A number of experiments were designed and run in order to study physical, chemical, biological and ecological parameters of the river quality at ambient levels and in areas affected by aquaculture. These were repeated monthly for a period of six months. Hydrological studies over the same period investigated the patterns of currents in the river and the separation and mixing of water masses in the river over daily and monthly tidal cycles.
Results are discussed with reference to international water quality standards and known toxicological limits of fish species. The suitability of the areas for aquaculture is confirmed, though ongoing monitoring is recommended. The impact of excess food and increased sedimentation below cages, and the need to reduce losses is discussed.
Other pollutants released from aquaculture operations will also have long term impacts on the environment, even though they may be in only small concentrations, most importantly nitrites and ammonia.
Based on these results, recommendations are made for maintaining water quality, reducing losses of excess food and other nutrients, identifying factors for new the siting of new operations and improving efficiency of operators.
Following on from the Ongoing Monitoring Procedures training course delivered by IEC to Fisheries staff, details of the ongoing monitoring program are given with recommended sampling frequency and parameters for ongoing testing.
CLIENT: BRUNEI SHELL PETROLEUM CO. SDN BHD (BSP)
DEPARTMENT OF FISHERIES
The issue of overtrawling in Brunei centres around commercial fishermen seeking to expand their fishing grounds, and oil industry concerns over safety and environmental issues from damages to seabed structures.
IEC were requested to examine existing regulations and practices on fishing over seabed pipelines, then draw from international experiences to present scenarios for Brunei that improve fishing access without compromising safety and operational requirements of the Oil Industry.
Interviews were held with commercial fishery operators and Department of Fisheries officers to obtain current practices; and details of trawling gear used in Brunei. Overseas experience, particularly in the North Sea revealed a long established format for determining “trawlability” of pipelines, and Trenching Guidelines to calculate potential damages from trawling gear. Latest methods for improved safety include warning systems placed on board vessels using GIS location devises to advise of close proximity to the pipelines.
Options suitable for Brunei waters include: changes to pipeline design; new safety factors; modifying fishing gear on vessels; on board warning devises; and marine transponders showing vessel location. The most appropriate solution is a combination of scenarios which improve safety provisions and instill a “Duty of Care” on fishermen to be aware of the hazards of fishing close to seabed structures.
Results of the investigation will be incorporated into a Strategy Paper describing the way forward for co-incidental use of the seabed by fishermen and the oil companies.
Innisfail, Queensland, Australia, 1989
PROJECT VALUE A$10.0 million
GENERAL PARTNER Forestall Securities
OWNER/MANAGER Farmer Johnson Pty Ltd
ROLE Advisor to Zamane Securities
Land totalling 448 ha and comprising sugar cane farms are being phased out as the construction of the breeding and grow out ponds proceed the land is gently sloping, enabling pond construction with a minimum of earthworks. Slope of the land facilitates site drainage and flooding is not considered to be a problem in this location. The soils within the property area are generally impervious clays with excellent water-holding capacity. Large quantities of water for pond filling are drawn from Liverpool Creek which bounds parts of the property and Cowley creek which traverses the property. A major advantage of the property is its position in the local catchment basin, the majority of which is State Forest, ensuring unpolluted runoff water.
The Farm Owner, Farmer Johnson Aquaculture Ltd, is developing modern and efficient aquaculture facilities, using large-scale pond construction technology. The Site Development Program was timed to have the nursery/hatchery completed and 80 ha of ponds operative before 30 June 1989, to enable the first of the limited partnerships to be in business by that date. The balance of these ponds were completed by December 1989.
A modern packing and processing facility was built by the Farm Owner for first stage operation in time for the first harvest. The facilities will incorporate automatic sizing and sorting equipment developed in Israel for packing and processing large fresh water prawns, with freezer and cool storage facilities designed to handle peak harvest throughout of up to 15 tonnes of Red Claw per day if necessary.
CLIENT : GOVERNMENT OF BRUNEI
- DRAINAGE & SEWERAGE SERVICES, PUBLIC WORKS DEPARTMENT
- DEPARTMENT OF AGRICULTURE
CONTRACT SUM B$8.4 million
COMPLETION DATE Design/Documentation Phase
The project involved the supply of irrigation water for two existing Agricultural Stations at Kilanas and Bengkurong. Services provided by CMP-Hamzah included preliminary assessment and design, establishing water demand for irrigation and water source for the supply, detailed design of a 10,000 ml dam on Sungai Tampoi and associated transmission and distribution systems at the two Agricultural Stations.
The project is currently under review to amend the scope of work for irrigation supply to Betumpu-Masin Agricultural Area. New water demand analysis and distribution network is being designed for the Scheme which may have secondary benefits of reducing flooding potential in the Mulaut Plain.
CLIENT : DEPARTMENT OF PUBLIC WORKS
END-USER: DEPARTMENT OF AGRICULTURE
CONTRACT SUM B$8.8 million
Scheme evaluation involved optimisation of a bulk supply system for 406 ha of mixed farming allotments and a 312 Ha mechanised rice project. The source of water was an existing low lying reservoir at Imang, over 7.5km from the farm allotments.
The system will be capable of delivering 19 ML/day to the agricultural area and a further 31 ML/day to the rice project.
Components of the scheme were designed and selected on the basis of ease of operation, enduser requirements, whole of life cost economics, reservoir capacity and supply reliability. They include:-
Intake structure and pump station equipped with 4 x 105kw centrifugal pumps mounted in a dry well and operating on a duty/duty/duty/standby basis.
11kv ring main extension and integrated substation and control centre.
Rising main of 711mm diameter and 244m long.
Service reservoir situated on an adjacent ridge with total storage capacity of 10,000 m3 held in two parallel cells.
Pressure gravity main of 762 and 711 mm diameter over 7.5km long to supply agricultural areas.
16.4km of steel and HDPE pipe in a reticulation network with water meters and flow control valves on connected allotments.
A SCADA Telemetry System will enable monitoring a control of the system.
Relative advantages of the scheme are: comparatively high residual pressures within the network; only one pumping station; simplicity of construction; easily expanded low operational manpower requirements; and metered valves at allotments enable automatic shutoff and gauging of waterflow for consumer.
CLIENT: GOVERNMENT OF BRUNEI TOWN & COUNTRY PLANNING DEPARTMENT
LEAD CONSULTANT : ASASREKA AKITEK
IEC were engaged for Study Management, landuse and environmental planning, and landscape architecture to complete the Interim and Final Phases of the Local Plan for Kampung Mumong.
The work at Interim Phase involved specialist studies in socio-economics, government structure and organisation, infrastructure and utilities, recreation and environment to produce three options for different growth strategies and evaluation to produce a Preferred Concept Plan.
The Final Phase of work involved production of the Local Plan and a Development Plan for the community describing infrastructure and facilities required to create the framework for implementing the Local Plan. To further strengthen the identity of Mumong and provide economic catalysts for development, Action Area Plans were prepared identifying key components to be undertaken by private sector and government namely: Wholesale Trade and Agricultural Centre, Riverfront Development, Local Commercial Centres and a Highway Service Centre.
Cost estimates for proposed development and infrastructure were prepared together with initiatives for private sector involvement and revenue sources for Brunei government.
CLIENT : DEPARTMENT OF AGRICULTURE & AGRIFOOD
END-USER: DEPARTMENT OF AGRICULTURE/ PRIVATE SECTOR
WORKS VALUE: B$74.45 million
Site planning was undertaken on a ‘precinct’ basis where complementary activities are placed together, separating industrial uses from the commercial and recreational. There are ten precincts within Wasan Rice Processing Centre, taking up approximately 25 hectares of land with a 50 hectare development site.
The Rice production facilities are set out on a flow-through basis: padi loaded on trucks enters in the southern gateway to the new drying facilities. Padi is dried to a suitable moisture content for long term storage (approximately 13%) and is then conveyed to the bulk padi silos. From here it is conveyed into the rice-milling plant where it is dried further to approximately 8%, separated husks from rice, polished and bagged for the finished product. The milled rice is then transferred to the bulk store centre where it is held until required at the wholesale/retail outlet.
Rice husk from the milling process is transferred to the waste processing facility, where it is either conveyed to the initial receiving and drying facility to fuel the padi drying machines, or stored after further processing (e.g. pelletisation).
The construction and staging program for the RPC Masterplan has been adjusted to incorporate 14 works packages of approximately $5 million - $6 million each out of a total project cost of $74.5 million over 12 years.
The Staging Plan is prepared with reference to both DoAA’s current priorities, with regard to projected padi harvest yields for the Brunei-Muara District for 2015-2018, and the pressing need for bulk rice storage.