Infrastructure design and optimization; FEED; asset management strategies; environmental compliance; corridor impact assessments; hydraulic and networks analysis; renewables; waste to energy
CLIENT : THE GOVERNMENT OF NEGARA BRUNEI DARUSSALAM
The existing galvanized gas distribution system in the Belait Region of Negara Brunei Darussalam was constructed in the late 1940’s and early 1950’s and by the 1990’s much of this system had deteriorated and required upgrading and expanding to cater for new development areas.
IEC Sdn, Bhd. were appointed by the Government of Negara Brunei Darussalam in 1992 to review and evaluated the existing domestic gas distribution system to make recommendations for the systems’ upgrade. Following IEC Sdn Bhd. review recommendations, detailed designs and documentation were prepared for the system upgrade.
The project included both urban and sub-urban sites with particular attention being given in completing the design to ensure a smooth transition during construction from the existing system to the upgraded network.
Central to the distribution system upgrade was the networks inter-connection to Brunei Shell Petroleum’s “let down” and metering stations in Seria, Kuala Belait and Sungai Teraban.
The new plastic (MDPE) gas distribution system involved over 100km of gas mains and in excess of 3,000 metered house connections.
Total project construction cost B$8.0 million.
CLIENT : BRUNEI SHELL PETROLEUM CO. SDN BHD
IEC were commissioned by Brunei Shell Petroleum to undertake assessment and design for landscape rehabilitation of a 40 metre wide corridor containing a high pressure gas main from Jerudong Gas Metering Station to Berakas Power Station approximately 11 kilometres. The corridor passed through several types of coastal forest or heath and crossed approximately ten waterways. Bedrock and soils were generally light, friable and highly eroded requiring backfilling, stabilization and runoff control.
The concept for the rehabilitation was to reinstate the pipeline route to a condition similar to the surrounding environment I.e. secondary forest and heath. Service access was unnecessary while emergency access would clear minor vegetation over the pipeline. A range of treatments were devised which utilized existing materials on site (e.g. felled logs and boulders) with organic based geofabrics, limited amounts of prefabricated drains and culverts, and extensive planting. Stream crossings were altered to allow free passage of water or upgraded with more appropriate bank stabilization materials. Extensive hydroseeding of mixed grasses together with planting of indigenous trees and shrubs strategically placed ensured rapid revegetation of the pipeline route.
Construction was completed over nine months at a total cost of $1.0 million. The pipeline route can now only be traced by the marker sign through the forest.
CLIENT : BRUNEI SHELL PETROLEUM CO. SDN BHD
Brunei Shell Petroleum provide potable water and gas to their commercial, industrial and domestic facilities in Kuala Belait. Both systems of approximately 190km grid required upgrading due to aging and operational problems. Seven tasks were undertaken to generate a Master Plan for replacement:-
Establishment of basic design parameters : supply points to grid, supply pressures and quantities, chemical analyses, consumers, compatibility with government grids.
Materials selection for pipelines from selection of DICL, uPVC, GRP, MDPE and ABS. MDPE PE80 was the recommended material.
Water and Gas Reticulation Analysis and Concept Design using computer modeling and Computer Aided Design.
Budget Cost Estimate for supply and installation of the systems examining common trenching options and other cost saving measures.
Soils Contamination Survey to determine suitability for using MDPE pipelines which may be susceptible to permeation by hydrocarbons.
Environmental Impact Assessment on the biophysical and cultural environment of the study areas, including : groundwater, surface runoff and waterways, flora/fauna and estuarine habitat, air and noise pollution, traffic flow and utilities, soils and soil subsidence, public health and safety, aesthetics/visual quality.
The Concept Design and EIA were presented to BSP in April 1996, and progressive replacement of the systems are currently being undertaken by BSP.
CLIENT : DEPARTMENT OF PUBLIC WORKS
END-USER: DEPARTMENT OF AGRICULTURE
CONTRACT SUM B$7.6 million
Scheme evaluation involved determining the optimal supply and distribution network to 406 ha of mixed farming allotments. The source of water was an existing low lying reservoir at Imang, some 10 km from the farm allotments.
Following consideration of engineering practicalities, water quality, endusers, economics, weather regime and dam capacity, major components of the scheme were selected. They include:-
an intake structure and pump station equipped with 3 x 105kw submersible centrifugal pumps.
11kv substation and control centre.
a rising main of 175m running up to a ridge top 10,000m3 concrete holding tank.
an 800mm dia GRP gravity bulk supply main connecting to the agricultural areas.
a 16.4km of uPVC gravity reticulation network with metered water service valves connecting allotments.
Raw water from the reservoir will be filtered and pumped to the holding tank at 220 litres/sec and delivered to the allotments over a 12-hour period at a minimum head of 16 metres. A SCADA Telemetry System will enable monitoring a control of the system.
Relative advantages of the scheme are: comparatively high residual pressures within the network; only one pumping station; simplicity of construction; easily expanded low level of manpower to operate; and metered valves at allotments enable automatic shutoff and gauging of waterflow for consumer billing.
The project is awaiting calling of tender for anticipated construction in 2002 and commissioning in 2003.
CLIENT: Anson International Sdn Bhd
KPI ROLE: Master planning, Engineering Design, EIA/EMMP
The project will serve as the anchor facility for the Brunei Darussalam Maritime Cluster (BDMC) and falls within the government's aspirations of expanding its services industry sector. Development of the IMMDY means BSP vessels requiring maintenance, repairs, overhaul decommissioning and restoration will be able to use a locally based integrated yard.
Facilities include:
200m quayside with 20t/m2 capacity, bunkering for water and fluids, 200t test bollard;
Slipway with 6,000 tonne vessel capacity for repairs and refitting;
Decommissioning yard for breakdown and recycling of offshore rigs, platforms & jackets;
Maintenance yard for repairs and fabrication of new structures and vessels;
Marine workshops for mechanical repairs and fabrication, electrical and control systems workshop, vessel pipelines and painting shop;
Contaminated water treatment system, and recycling of fractional parts to ensure reuse back into industrial applications.
The Central Facilities building controls yard operations and has offices for: annual survey of vessels; certificate renewals; special surveys; and the commercial aspects of vessel maintenance and repairs, fabrication of new vessels, offshore platforms and concrete structures.
BSP has a major decommissioning project for offshore facilities coming up, and the IMMDY can play a lead role in enabling the project to be serviced locally and in compliance with environmental sustainability requirements. Overall, the project can be considered of national significance and a flagship for other oil and gas industry support services in Brunei.
CLIENT: Anson International Sdn Bhd
KPI ROLE: Marine Engineering Design, EIA/EMMP
The project will serve as the anchor facility for the Brunei Darussalam Maritime Cluster (BDMC) and falls within the government's aspirations of expanding its services industry sector. Development of the IMMDY means BSP vessels requiring maintenance, repairs, overhaul decommissioning and restoration will be able to use a locally based integrated yard.
The dredging plan requires water depths of 7 m below Chart Datum (CD), and at this depth a distance of 900 m of 100 m wide channel is required to merge with the Muara Port Western Channel.
At the dockside a minimum distance of 200 m radius is allowed for vessel maneuvering which has a high safety margin for vessel LOA of 60 m maximum. The dimensions and depth of the dredging area create an overall dredge volume of 708,000 m3 of material to be removed from the seabed.
CLIENT: Brunei Shell Marketing
CAPITAL WORKS VALUE: $12.0 million
In 1996 KPI Sdn Bhd were awarded a five-year contract, together with Arkitek Ibrahim, for completing new service stations and upgrading existing service stations throughout Brunei.
KPI Sdn Bhd was responsible for all civil/structural works, and mechanical works including plumbing, underground tank installations and pumping systems.
New petrol filling stations included: Lamunin, Lumapas, Lambank Kanan, Salambigar (TIBA), and Jalan Berakas near Berakas Army Camp.
All new service stations were fitted with high speed pumps, and vapour recovery systems. Buildings included workshops, hoists, all weather canopies, and retail outlets with franchised fast food and mini-markets.
Upgrading and remedial works included underground tank replacements, new canopy installations, forecourt replacements and new corporate livery installations. Refurnishments to filling stations included: Roxana in BSB, SPPMP in Belait, Keriam in Tutong, Kampong Bunut, Temburong, Gadong, Jangsak and Jalan Tutong.